Reference No. |
Title |
First Announcement Date |
Last Submission Date |
Details |
Mktg. 1324 Dt: 30-11-2023 |
Sale of Molasses |
30-11-2023 |
16-12-2023 |
 |
NO. Mktg.1196 Dt: 31.10.2023 |
Sale of Semi Processed Sugar |
31-10-2023 |
21-11-2023 |
 |
MFG(DIST)/1101/18/10/2023 |
Supply & erection of Mass flow meter |
18-10-2023 |
07-11-2023 |
 |
PUR/955/25/9/2023 |
Supply of MS plate |
25-09-2023 |
17-10-2023 |
 |
MFG/DIST/735 Dt. 05.08.2023 |
FABRICATION,ERECTION OF MASS FLOW METERS & RADAR BASED LEVEL TRANSMITTERS |
05-08-2023 |
25-08-2023 |
 |
Eng/711/02082023 |
Dismanting ,Febrication, Erection and Commissioning ofBoiler wall Tubes |
02-08-2023 |
25-08-2023 |
 |
Eng. 543 Date 30.06.2023 |
DISMANTLING, FABRICATION AND ERECTION |
30-06-2023 |
20-07-2023 |
 |
Mfg_457_08.06.2023 |
Audit for Hazardous waste (Management and Handling ) Rule-2016 |
08-06-2023 |
29-06-2023 |
 |
Mktg.69 Date: 10/04/2023 |
Sale of Damaged cartoon / Damaged polythene /Garbage cartoon/ damaged Glass bottle |
10-04-2023 |
09-05-2023 |
 |
MM. 09 Dt: 03.4.2023 |
Unloading empty glass bottle with packing material |
03-04-2023 |
02-05-2023 |
 |
Mktg.06 Dt: 03.04.2023 |
Loading country liquor box on the vehicle |
03-04-2023 |
02-05-2023 |
 |
GAD 2097 Dt: 28.03.2023 |
Manpower supply |
28-03-2023 |
20-04-2023 |
 |
Mktg.2088 Dt: 27.03.2023 |
Country Liquor Transport to OSBC Depot. |
27-03-2023 |
28-04-2023 |
 |
Dist_2071_23032023 |
Country Liquor Bottling in Semiautomatic Unit |
23-03-2023 |
26-04-2023 |
 |
Dist_2070_23032023 |
Country Liquor Bottling in Automatic Bottling unit |
23-03-2023 |
26-04-2023 |
 |
Pur_2062_23032023 |
Purchase of Empty Glass Bottles |
23-03-2023 |
17-04-2023 |
 |
Pur_2063_23032023 |
Purchase of Label |
23-03-2023 |
17-04-2023 |
 |
Pur_2064_23032023 |
Purchase of Ropp Aluminum Cap |
23-03-2023 |
19-04-2023 |
 |
Pur_2065_23032023 |
Purchase of BOPP self Adhesive Tape |
23-03-2023 |
24-04-2023 |
 |
Pur_2066_23032023 |
Purchase of Industrial Adhesive Gum and Oridnary Gum |
23-03-2023 |
24-04-2023 |
 |
Pur_2067_23032023 |
Purchase of Corrugated Boxes |
23-03-2023 |
24-04-2023 |
 |
Mktg.2058 Dt: 23/03/2023 |
Purchase of Extran Neutral Alcohol |
23-03-2023 |
19-04-2023 |
 |
1864 Dt: 24.01.2023 |
Extension date for molasses sale |
13-01-2023 |
01-02-2023 |
 |
Mktg. 1768 Dt: 13/01/2023 |
Sale of Molasses |
13-01-2023 |
23-01-2023 |
 |
Mfg. 1673 Dt: 02.01.2023 |
Lifting of Process Chemicals, sulphur, general cleaning chemicals etc. |
02-01-2023 |
06-01-2023 |
 |
Engg. 1676 Dt: 02.01.2023 |
Removal of Boiler Ash |
02-01-2023 |
06-01-2023 |
 |
Mktg.1611 Dated: 27/12/2022 |
Removal of Filter cake |
27-12-2022 |
31-12-2022 |
 |
Mktg.1608 Dated: 27/12/2022 |
SUGAR BAG Bagging, weighing, stitching etc. |
27-12-2022 |
31-12-2022 |
 |
Mktg.1605 dated: 27/12/2022 |
SUGAR BAG STACKING & LOADING ON THE VEHICLE |
27-12-2022 |
31-12-2022 |
 |
Mfg_1597_27/12/2022 |
Prepartion of Milk LIme and Lifting process chemicals sugar Season 2022-23 |
27-12-2022 |
31-12-2022 |
 |
Eng_1601_27/12/2022 |
Bagasse Handling Sugar Season 2022-23 |
27-12-2022 |
31-12-2022 |
 |
Eng_1603_27/12/2022 |
Supply of Labours for engineering Seaction Sugar season 2022-23 |
27-12-2022 |
31-12-2022 |
 |
Eng_1599_27/12/2022 |
Removal & Shifting of Boiler Ash Season 2022-23 |
27-12-2022 |
31-12-2022 |
 |
Letter-1531 Dated-19/12/2022. |
Sugarcane Transportation work sugar season 2022-23 |
19-12-2022 |
27-12-2022 |
 |
Mfg-1534 Date-19/12/2022 |
Preparation of Milk lime and Lifting of Process chemical for season 2022-23 |
19-12-2022 |
26-12-2022 |
 |
Eng-1536 Dt-19/12/2022 |
Bagasse Handling Crushing Season2022-23 |
19-12-2022 |
26-12-2022 |
 |
Eng-1538 Dt-19/12/2022 |
Removal of Boiler Ash for season 2022-23 |
19-12-2022 |
26-12-2022 |
 |
Engg-1540 dated-19122022 |
Supply of Labour for Engineering Section 2022-23 Season. |
19-12-2022 |
26-12-2022 |
 |
mktg. 1515 dated: 17/12/2022 |
Removal of Filter Cake for 2022-23 Season |
19-12-2022 |
26-12-2022 |
 |
Mktg. 1522 |
SUGAR BAG STACKING & LOADING ON THE VEHICLE FOR 2022-23 SEASON |
19-12-2022 |
26-12-2022 |
 |
Mktg. 1522 |
SUGAR BAG BAGGING for 2022-23 Season |
17-12-2022 |
26-12-2022 |
 |
mktg.1498 Date: 13.12.2022 |
OPENING DATE OF SALE OF SEMI SUGAR |
13-12-2022 |
14-12-2022 |
 |
No. 1345 Dated: 11/11/2022 |
Sale of Semi Processed sugar |
11-11-2022 |
28-11-2022 |
 |
Engg. No. 1145 Date: 27.09.2022 |
Cleaning, Painting, plastering etc. of Boiler Chimney |
27-09-2022 |
17-10-2022 |
 |
Engg.1134 Date: 26/09/2022 |
ERECTION & DISMANTLING OF Sulphur Burner, vacum Filter etc. |
26-09-2022 |
17-10-2022 |
 |
Ltr No. 761 Dt: 16/08/2022 |
Extension time period of tender for boiling house material |
16-08-2022 |
23-08-2022 |
 |
PUR_659 Date: 27/07/2022 |
Supply of Sulphur burner, Vacuum filter drum etc. |
27-07-2022 |
13-08-2022 |
 |
PUR_222_07052022 |
Extention of Time Period No.PUR_121-20042022 for supply of Glass bottles |
20-04-2022 |
13-05-2022 |
 |
Mktg.146 Date: 23/04/2022 |
Sale of Damaged cartoon/Polythene/Glass bottle, Cartoon garbage |
23-04-2022 |
09-05-2022 |
 |
PUR_133_20042022 |
Supply of Paddhy Husk _ Cashew Cake |
20-04-2022 |
27-04-2022 |
 |
PUR_121_20042022 |
Supply of 200ML empty glass bottles |
20-04-2022 |
05-05-2022 |
 |
Engg. 28 Date: 08/04/2022 |
DISMANTLING & FABRICATION OF BOILER |
08-04-2022 |
27-04-2022 |
 |
PUR_1981_17032022 |
Extention the time period of quotation call notice |
26-02-2022 |
25-03-2022 |
 |
Mktg.2027 Date: 09/03/2022 |
TRANSPORT OF COUNTRY LIQUOR TO OSBC DEPOT |
09-03-2022 |
28-03-2022 |
 |
Mktg.2028 date:09/03/2022 |
SUPPLY OF EXTRA NEUTRAL ALCOHOL (ENA) |
09-03-2022 |
24-03-2022 |
 |
PUR_1911_26022022 |
Supply of Adhesive Tape |
26-02-2022 |
16-03-2022 |
 |
PUR_1912_26022022 |
Supply of Chromo Art Paper die cutting Lable |
26-02-2022 |
16-03-2022 |
 |
PUR_1914_26022022 |
Supply of ROPP Cap |
26-02-2022 |
14-03-2022 |
 |
PUR_1913_26022022 |
Supply of Corrugated Boxes |
26-02-2022 |
14-03-2022 |
 |
PUR_1910_26022022 |
Supply of 200ML Empty Glass Bottles |
26-02-2022 |
22-03-2022 |
 |
DIST_1697_15012022 |
Preparation of DPR for Setting Up 100KLPD Grain Based Ethanal Plant |
15-01-2022 |
22-01-2022 |
 |
DIST_1678_08012022 |
Detail Project Report for 100KLPD Grain based Ethanol Plant |
10-01-2022 |
15-01-2022 |
 |
Mktg.1589 Date: 30/12/2021 |
removal of filter cake 21-22 season |
30-12-2021 |
05-01-2022 |
 |
Mktg. 1586 Date: 30/12/2021 |
sugar bag bagging, weighing, stitching etc. 21-22 season |
30-12-2021 |
05-01-2022 |
 |
Mktg.1599 Date: 31/12/2021 |
sale of molasses |
31-12-2021 |
07-01-2022 |
 |
mfg.1542 date: 22/12/2021 |
RE-TENDER of Labour supply for season 2021-22 |
22-12-2021 |
30-12-2021 |
 |
No. 1503 Date: 15/12/2021 |
REMOVAL OF FILTER CAKE 21-22 SEASON |
15-12-2021 |
27-12-2021 |
 |
No. 1497 DATE: 15/12/2021 |
SUGAR BAG SEALING,WEIGHING & STITCHIN 21-22 SEASON |
15-12-2021 |
27-12-2021 |
 |
No. 1500 date: 15/12/2021 |
SUGAR BAG STACKING & LOADING ON THE VEHICLE |
15-12-2021 |
27-12-2021 |
 |
GAD/1486 Dated: 14-12-2021 |
MANPOWER SUPPLY FOR SEASON 2021-22 |
14-12-2021 |
22-12-2021 |
 |
No. 1454 Date: 09-12-2021 |
AMC of online MONITORING system for data transper |
09-12-2021 |
23-12-2021 |
 |
No. 1446 Dated: 08/12/2021 |
sale of semi sugar |
08-12-2021 |
23-12-2021 |
 |
No. 1410 Date: 04/12/2021 |
Labour supply for season 2021-22 |
04-12-2021 |
20-12-2021 |
 |
No. 1237 date: 17/11/2021 |
SALE OF REJECT LIME |
17-11-2021 |
23-11-2021 |
 |
PUR_1146_06112021 |
Supply of Burnt lime_HDPPE Bag_Lubricants_Boiler fuels_chemicals |
06-11-2021 |
20-11-2021 |
 |
No. 1106 Date: 25/10/2021 |
SALE OF SCRAP MATERIALS |
25-10-2021 |
08-11-2021 |
 |
Letter No. 1096 |
Labour supply for cleaning of spray pond |
22-10-2021 |
27-10-2021 |
 |
892 date: 17/09/2021 |
Extended tender for dismantling & fabrication of boiler chimney |
17-09-2021 |
23-09-2021 |
 |
ENG_892_17092021 |
Extended Tender Call Notice No.775_27082021 (Boiler Chimney) |
27-08-2021 |
23-09-2021 |
 |
Ltr 881 Date: 15/09/2021 |
Sale of Used Machineries |
15-09-2021 |
29-09-2021 |
 |
875 Date: 13/09/2021 |
Date extension for ROOFING OF THE SUGAR PLANT |
13-09-2021 |
16-09-2021 |
 |
PUR_782_31082021 |
Supply of PHD Materials |
31-08-2021 |
15-09-2021 |
 |
PUR_783_31082021 |
Supply of MS Plate, Angle, Channel, MS pipe etc |
31-08-2021 |
15-09-2021 |
 |
PUR_781_31082021 |
Supply of Electronic Weigh Bride |
31-08-2021 |
15-09-2021 |
 |
Engg.775 Date: 27/08/2021 |
DISMANTLING, FABRICATION, ERECTION etc. of CHIMNEY |
27-08-2021 |
15-09-2021 |
 |
No. 747 Date: 24/08/2021 |
ROOFING WORK OF SUGAR PLANT, GODOWN,DM PLANT etc. |
24-08-2021 |
08-09-2021 |
 |
No. Mktg. 380 Date: 09/06/2021 |
Extended the tender call notice of sale of filter cake |
09-06-2021 |
22-06-2021 |
 |
PUR _368 Date: 08/06/2021 |
EXTENDED TENDER CALL OF DISMANTLING & RETUBING OF BOILER |
08-06-2021 |
17-06-2021 |
 |
Mktg.334 Date: 02/06/2021 |
Sale of filter cake/press mud |
02-06-2021 |
08-06-2021 |
 |
PUR_266 Date: 20/05/2021 |
DISMANTLING & RETUBING OF OR-529 BOILER |
20-05-2021 |
07-06-2021 |
 |
MM.: 76 Date: 12/04/2021 |
Unloading of Empty glass bottle with packing materials |
12-04-2021 |
19-04-2021 |
 |
Mktg.: 73 DAte: 12/04/2021 |
Loading of Country Liquor |
12-04-2021 |
19-04-2021 |
 |
Mktg. 79 Date: 12/04/2021 |
Sale of Bagasse |
12-04-2021 |
19-04-2021 |
 |
Mktg. 53 Date: 07/04/2021 |
Sale of Sugar |
07-04-2021 |
16-04-2021 |
 |
Distl 19 Date: 03/04/2021 |
Corringendum to tender call notice CL bottling at Semi-Auto bottling unit |
03-04-2021 |
09-04-2021 |
 |
Dist: 20 Date 03/04/2021 |
Corringendum to tender call for CL bottling at automatic bottling unit |
03-04-2021 |
09-04-2021 |
 |
Dist: 5962 Date: 31/03/2021 |
Consultants for ENA Plant & Zero discharge liquid system |
31-03-2021 |
15-04-2021 |
 |
Dist_5198_23032021 |
Country Liquor Bottling at Auto Bottling Plant |
23-03-2021 |
09-04-2021 |
 |
Dist_5199_23032021 |
Country Liquor Bottling in Semi Automatic Plant |
23-03-2021 |
09-04-2021 |
 |
PUR/5170/13-03-2021 |
Maintenance work of Automatics Bottling Unit |
13-03-2021 |
24-03-2021 |
 |
Mktg. 5128 Date: 10/03/2021 |
Tender for sale of UNSERVICABLE MATERIALS / DAMAGED CARTOON WITH POLYTHINE, GARBAGE, DAMAGED bottle |
10-03-2021 |
24-03-2021 |
 |
Mktg. 4536 |
Sugar Bag Stacking & loading on the vehicle 2020-21 |
22-12-2020 |
06-01-2021 |
 |
Mktg. 4544 |
Sugar Bagging 2020-21 Season |
22-12-2020 |
06-01-2021 |
 |
Mktg.4536 |
Sale of Molasses |
22-12-2020 |
06-01-2021 |
 |
No. 4496 Date: 18/12/2020 |
TRANSPORTATION OF SUGAR CANE 2020-21 SEASON |
18-12-2020 |
04-01-2021 |
 |
No. 4494 Date: 17/12/2020 |
LABOUR SUPPLY FOR SEASON 20-21 |
17-12-2020 |
21-12-2020 |
 |
PUR/4441/10122020 |
Supply of HDPPE BAG |
10-12-2020 |
21-12-2020 |
 |
PUR/4440/10122020 |
Supply of Induction Motor |
10-12-2020 |
21-12-2020 |
 |
PUR/4439/10122020 |
Supply of Valves |
10-12-2020 |
21-12-2020 |
 |
PUR/4438/10122020 |
Supply of Burnt Lime |
10-12-2020 |
21-12-2020 |
 |
PUR/4437/10122020 |
Supply of Boiler Fuels |
10-12-2020 |
21-12-2020 |
 |
No. 4417 Date: 09/12/2020 |
Extension of opening date for Supply of ENA |
24-11-2020 |
09-12-2020 |
 |
Pur 3312 Date: 05/05/2012 |
POSTPONEMENT OF QUOTATION CALL NOTICE FOR BOTTLING MATERIALS |
05-05-2020 |
05-05-2020 |
 |
NO. Mktg.3311 Date: 05/05/2020 |
POSTPONMENT OF TENDER FOR TRANSPORTATION OF COUNTRY LIQUOR (2020-21) |
05-05-2020 |
05-05-2020 |
 |
No.Mktg. 3247 dATE: 30/04/2020 |
SUPPLY OF EXTRA NEUTRAL ALCOHOL (ENA) |
30-04-2020 |
07-05-2020 |
 |
PUR_1988_11012020 |
Supply & Erection and Commissioning of 500 KVA Transformer |
01-01-1970 |
11-01-2020 |
 |
NO.2833 DATE: 19/12/2019 |
LABOUR SUPPLY FOR 2019-20 SEASON |
19-12-2019 |
24-12-2019 |
 |
No. 1761 Date: 10/12/2019 |
supply of labour for Season 2019-20 |
10-12-2019 |
16-12-2019 |
 |
No. 1744 Date: 09/12/2019 |
REMOVAL OF FILTER CAKE |
09-12-2019 |
18-12-2019 |
 |
1741 |
SUGAR BAG BAGGING,WEIGHING,STITCHING etc. |
09-12-2019 |
18-12-2019 |
 |
No. 1738 date: 09/12/2019 |
SUGAR STACKING AT GODOWN & LOADING ON THE VEHICLE |
09-12-2019 |
18-12-2019 |
 |
No. 1732 Date: 09/12/2019 |
SUGAR CANE TRANSPORTAION 2019-20 CRUSHING SEASON |
09-12-2019 |
23-12-2019 |
 |
ENGG. 1704 DATE: 04/12/2019 |
BAGASSES HANDLING, REMOVAL OF ASH, LABOUR SUPPLY FOR CLEANING FOR 2019-20 SEASON |
04-12-2019 |
09-12-2019 |
 |
GAD_1665_28112019 |
Providing Manpower for the Crushing Season 2019-20 |
28-11-2019 |
10-12-2019 |
 |
PUR_1455_28/11/2019 |
Supply of Burnt Lime, Roll Sulphur, Lubricants & Chemicals |
28-11-2019 |
05-12-2019 |
 |
(Mktg) 1424 Date : 25/11/2019 |
SALE OF MOLASSES |
25-11-2019 |
05-12-2019 |
 |
Ltr No. 1340 date: 14/11/2019 |
supply of MECHANICAL SEAL OF PUMPS |
14-11-2019 |
21-11-2019 |
 |
PUR/1323/08/11/2019 |
Supply of CC TV |
08-11-2019 |
21-11-2019 |
 |
PUR/1294/07/11/2019 |
Supply of Burnt Lime, HDPPE Bag, Roll Sulphur, Lubricants, Boiler Fuels and Chemicals |
07-11-2019 |
21-11-2019 |
 |
PUR_3891_20032019 |
Supply of Corrugated boxes |
20-03-2019 |
27-03-2019 |
 |
PUR_3554_27022019 |
Supply of Bottling Materials |
27-02-2019 |
18-03-2019 |
 |
PUR_3553_27022019 |
Supply of 200ML empty glass bottles |
27-02-2019 |
17-03-2019 |
 |
Mktg. 3307 Date: 20/02/2019 |
TRANSPORTATION OF COUNTRY LIQUOR 2019-20 |
20-02-2019 |
08-03-2019 |
 |
Mktg. 3293 DATE: 19/02/2019 |
QUOTATION CALL FOR PURCHASE OF ENA |
19-02-2019 |
07-02-2019 |
 |
PUR_3300_20022019 |
Instrumentation of Fermentation section |
20-02-2019 |
01-03-2019 |
 |
PUR_3299_20022019 |
Air Compressor with Piping |
20-02-2019 |
01-03-2019 |
 |
PUR_3306_20022019 |
Fermentor recirculation & Cooling system |
20-02-2019 |
28-02-2019 |
 |
PUR_3305_20022019 |
Spent wash cooling & pumping system |
20-02-2019 |
28-02-2019 |
 |
PUR_3304_20022019 |
Molasses weighing system |
20-02-2019 |
28-02-2019 |
 |
PUR/2283/12/01/2019 |
PRUCHASE OF BEARING & ELECTRICAL MATERIAL |
12-01-2019 |
15-01-2019 |
 |
GAD-2227 DT: 01/01/2019 |
SUPPLY OF MANPOWER FOR 2018-19 SEASON |
01-01-2019 |
07-01-2019 |
 |
NO. 2141/2144/2147/2150_26.12.2018 |
SALE OF UNUSED MATERIAL, Denature SPIRIT, & REMOVAL OF FILTER CAKE & SUGAR HANDLING 2018-19 SEASON |
26-12-2018 |
03-01-2019 |
 |
Ltr No. 2135 Dt: 25/12/2018 |
All travel beams and structure surface cleaning & Painting 2018-19 |
25-12-2018 |
31-12-2018 |
 |
Ltr No. 2137 Dt: 25/12/2018 |
Labour Contractor for Season 2018-19 |
25-12-2018 |
31-12-2018 |
 |
mKTG. 2063 DATED: 19/12/2018 |
EXTENSION DATE FOR 700MT MOLASSES SALE |
19-12-2018 |
27-12-2018 |
 |
Mktg.1978 dated: 07/12/2018 |
SALE OF MOLASSES |
07-12-2018 |
17-12-2018 |
 |
No. 1929 Dated : 04/12/2018 |
SUGAR CANE TRANSPORT 2018-19 SEASON |
06-12-2018 |
08-12-2018 |
 |
1925 dated 04/12/2018 |
REMOVAL OF BAGASSES,BOILER ASH & MAINTENANCE OF STITCHING MACHINE |
04-12-2018 |
10-12-2018 |
 |
Ltr No. 1911 date: 01/12/2018 |
REQUIRED LABOUR CONTRACTOR FOR DIFFERENT JOBS 2018-19 SEASON |
01-12-2018 |
10-12-2018 |
 |
PUR_1881_27112018 |
Supply of HDPPE Bag, Roll Sulphur |
27-11-2018 |
07-12-2018 |
 |
1863 DATED 26/11/2018 |
TRANSPORTATION OF SUGAR CANE |
26-11-2018 |
03-12-2018 |
 |
PUR_1784_12112018 |
Supply of Burnt lime_PP bag_Sulphur_Chemicals_instrument_PHD materials |
12-11-2018 |
24-11-2018 |
 |
1530_29/09/2018 |
EXTENDED TENDER OF MILL HEAD STOCK PIN HOLE BORING & SLEEVE FITTING |
29-09-2018 |
09-10-2018 |
 |
PUR_1523_29092018 |
Power Turbine Rotor_Coupling Job work_Turbine spares |
29-09-2018 |
09-10-2018 |
 |
Mktg_1495_26092018 |
Sale of Molasses |
26-09-2018 |
05-09-2018 |
 |
Civil_1350_31/08/2018 |
Waterproofing Chemical including Labour charges |
31-08-2018 |
25-09-2018 |
 |
Ltr NO. 1346_ 31/08/2018 |
Overhauling of Evaporator-04 Nos. |
31-08-2018 |
08-09-2018 |
 |
PUR_1271_22082018_2 |
Coringedum to tender call notice no.1271 |
22-08-2018 |
05-09-2018 |
 |
Engg: 1304_29/08/2018 |
EXTENDED DATE FOR MILL HEAD STOCK PIN HOLE BORING & SLEEVE FITTING |
29-08-2018 |
29-08-2018 |
 |
PUR_1271_220818 |
Supply of Boiler Gauge Glass |
22-08-2018 |
05-09-2018 |
 |
PUR_1276_22082018 |
Supply of Centrifugal, Air Compressor_Pump_Mill house_DM plant_Hardware_Rubber materials |
22-08-2018 |
07-09-2018 |
 |
PUR_1275_22082018 |
Supply of Oil Seal_Rubber Bush_O Ring_V belt_Paints_Packing & Joints etc |
22-08-2018 |
06-09-2018 |
 |
PUR_1271_22082018 |
Supply of A.H Tube_Boiler Refractory_SS Tube_Tub Clean_Eqiup_Valves_Chain conveyor_Electrodes |
22-08-2018 |
05-09-2018 |
 |
1219_14/08/2018 |
MILL HEAD STOCK PIN HOLE BORING & SLEEVE FITTINGS |
14-08-2018 |
27-08-2018 |
 |
Mktg./1125_04/08/2018 |
SALE OF UNSERVICEABLE PACKING MATERIALS |
04-08-2018 |
16-08-2018 |
 |
PUR_1023_9 |
Drawings_8 |
20-07-2018 |
04-08-2018 |
 |
PUR_1023_8 |
Drawings_7 |
20-07-2018 |
04-08-2018 |
 |
PUR_1023_7 |
Drawings_6 |
20-07-2018 |
04-08-2018 |
 |
PUR_1023_6 |
Drawings_5 |
20-07-2018 |
04-08-2018 |
 |
PUR_1023_5 |
Drawings_4 |
20-07-2018 |
04-08-2018 |
 |
PUR_1023_4 |
Drawings_3 |
20-07-2018 |
04-08-2018 |
 |
PUR_1023_3 |
Drawings_2 |
20-07-2018 |
04-08-2018 |
 |
PUR_1023_2 |
Drawing_1 |
20-07-2018 |
04-08-2018 |
 |
PUR_1023_1 |
Drawings |
20-07-2018 |
04-08-2018 |
 |
PUR_1023_20072018 |
SUPPLY, DISMANTLING, FABRICATION, ERECTION & COMMISSIONING OF BOILER TUBES |
20-07-2018 |
04-08-2018 |
 |
940_11/07/2018 |
OVERHAULING & RECOMMISSIONING OF MILL TURBINES & POWER TURBINES |
11-07-2018 |
25-07-2018 |
 |
893_07/07/2018 |
SALE OF MOLASSES |
07-07-2018 |
23-07-2018 |
 |
PUR_796_29062018 |
EXTENTION OF TIME PERIOD OF TENDER CALL NOTICE |
14-06-2018 |
16-07-2018 |
 |
790_28-06-2018 |
EXTENSION DATE OF FABIRICATION & ERECTION OF BOILING HOUSE |
28-06-2018 |
05-07-2018 |
 |
PUR/668/22.06.2018 |
SUPPLY OF ROPP CAP |
22-06-2018 |
28-06-2018 |
 |
631_20/06/2018 |
labour charge for dismantling,fabrication |
20-06-2018 |
27-06-2018 |
 |
PUR_601_14062018 |
Supply of CI Scrapper, CS Trash Plate |
14-06-2018 |
28-06-2018 |
 |
PUR_604_14062018 |
SUPPLY OF DISTRIBUTION PANNEL |
14-06-2018 |
28-06-2018 |
 |
493_30/05/2018 |
SALE OF BAGASSES |
30-05-2018 |
12-06-2018 |
 |
PUR_328_12052018 |
SUPPLY OF MS PIPE_BEND_FLANGE_RAILING PIPE ETC |
12-05-2018 |
22-05-2018 |
 |
PUR_327_12052018 |
SUPPLY OF MS PLATE, ANGLE,CHANNEL |
12-05-2018 |
22-05-2018 |
 |
LETTER _298_08052018 |
CORRINGENDUM TO SHORT TENDER CALL NOTICE |
03-05-2018 |
11-05-2018 |
 |
272_03/05/2018 |
SUPPLY OF MS PLATE,ANGLE, CHANNEL OF TATA/SAIL MAKE |
03-05-2018 |
11-05-2018 |
 |
271_03/05/2018 |
SUPPLY OF PIPE, BEND, FLANGE, RAILING PIPE etc. |
03-05-2018 |
11-05-2018 |
 |
158 Dated: 24/04/2018 |
Tender for Sale of Carton Garbage |
24-04-2018 |
07-05-2018 |
 |
135 Dated: 21/04/2018 |
QUOTATION FOR ENA SUPPLY |
21-04-2018 |
10-05-2018 |
 |
111_17/04/2018 |
RE-TENDER FOR FABRICATION OF ALUMINIUM CABIN |
17-04-2018 |
25-04-2018 |
 |
104 Dated: 17/04/2018 |
DATE EXTENSION FOR TRANSPORTAION OF COUNTRY LIQUOR |
17-04-2018 |
26-04-2018 |
 |
DIST_23_05042015 |
SUPPLY, ERECTION & COMMISSIONING |
05-04-2018 |
11-04-2018 |
 |
DIST_26_05042018 |
CONSULTANTS/EXPERTS FOR ENA PLANT |
05-04-2018 |
12-04-2018 |
 |
10_ Date: 03/04/2018 |
COUNTRY LIQUOR TRANSPORTATION TO OSBC DEPOT. FOR 2018-19 |
03-04-2018 |
19-04-2018 |
 |
PUR_4212_30032018 |
SUPPLY OF 5PLY CORRUGATED BOXES |
30-03-2018 |
06-04-2018 |
 |
4131_21/03/2018 |
CONSTRUCTION OF ALUMINIUM FRAMED CABIN |
21-03-2018 |
31-03-2018 |
 |
4128_21/03/2018 |
SUPPLY OF CORRUGATED BOXES |
21-03-2018 |
28-03-2018 |
 |
PUR_4101_19032018 |
Extention of Time Period |
28-02-2018 |
26-03-2018 |
 |
PUR_3965_28022018 |
Supply of 200ML Empty Glass Bottles |
28-02-2018 |
17-03-2018 |
 |
PUR_3962_28022018 |
Supply of Bottling Materials |
28-02-2018 |
17-03-2018 |
 |
MKTG./3959_28/02/2018 |
SUPPLY OF RECTIFIED SPIRIT |
28-02-2018 |
15-03-2018 |
 |
3607_25/01/2018 |
REVAMPING OF OLD 10 KLPD DISTILLERY PLANT OT LATEST TECHNOLOGY |
25-01-2018 |
08-02-2018 |
 |
2090 - Date: 29/11/2017 |
SUGAR BAG STACKING & LOADING ON THE VEHICLE |
29-11-2017 |
08-12-2017 |
 |
2092 - DATE: 29/11/2017 |
SUGAR BAG WEIGHING,STITCHING,NUMBERING ETC. |
29-11-2017 |
08-12-2017 |
 |
2096_ Date: 29/11/2017 |
REMOVAL OF FILTER CAKE/PRESS MUD |
29-11-2017 |
07-12-2017 |
 |
2067 Date: 29/11/2017 |
MANPOWER SERVICE PROVIDER |
29-11-2017 |
09-11-2017 |
 |
1977_ Dt.: 17/11/2017 |
SUGAR CANE TRANSPORTATION FOR 2017-18 SEASON |
17-11-2017 |
24-11-2017 |
 |
1779_31/10/2017 |
EXTENSION DATE FOR PURCHASE OF VALVE, NICKLE SCREEN ETC. |
31-10-2017 |
06-11-2017 |
 |
1704_26/10/2017 |
EXTENDED DATE 28/10/2017 FOR SERVICING OF HYDRAULIC ACCUMULATORS. |
26-10-2017 |
28-10-2017 |
 |
1657_23/10/2017 |
EXTENDED DATE 28/10/2017 PURCHASE OF BURNT LIME, CHEMICALS & LABORATORY MATERIALS |
23-10-2017 |
27-10-2017 |
 |
1618_17/10/2017 |
SERVICING OF MILL HYDRAULIC ACCUMULATORS |
17-10-2017 |
24-10-2017 |
 |
1595_12/10/2017 |
EXTENDED DATE FOR DISMANTILING & ERECTION OF 10 KL/DAY DISTILLERY UNIT |
12-10-2017 |
17-10-2017 |
 |